July 6th 1994:
![]() |
| First load of lumber |
I picked up my first load of lumber on July 6th, just after the 4th from Vergennes Building Supply.
I used my 1984 F150 to haul the first loads of lumber, it was pretty much a rust bucket but still working.
![]() |
| Emily is sweeping a spot for the lumber while Matthew supervises. |
As much as we want to do things ourselves we all need friends. I leaned on mine pretty heavily, the very first day, Steve Tomashot and Ed Allen were there to help.
![]() |
| Ed and Fred doing some serious figuring. |
![]() |
| Steve and Matt |
![]() |
| The basement level is nearly framed, Steve doing the high work. |
![]() |
| Basement framed, decking next. |
![]() |
| Emily and her stick. |
Emily would use a stick to mark nail spacing, she always wanted to help.
By mid July of 1994 the basement was framed and decked. The real framing can now begin.