1998 - 1999: Heating, Doors and Trim

 I spent much of 1998 putting in my heating system with the help of Billy Prew. Most weekends Billy was at my place at least one day of the weekend helping my install my heating system. 

Door List

During 1999 I also installed all the six panel doors. June did the majority of the poly work, it was a lot of doors. 










Trim is called finish work, but should be called unfinished work, since it is never finished.

I ordered:

1000' of Victorian Casing

100 Corner Blocks

60 Plinth Blocks

350' of Victorian Baseboard

350' Base Shoe

900' of Jam Extension Material

100' of 1 1/16" x 4" for Window Sills

I thought I over estimated, I barely had enough.