I spent much of 1998 putting in my heating system with the help of Billy Prew. Most weekends Billy was at my place at least one day of the weekend helping my install my heating system.
![]() |
| Door List |
During 1999 I also installed all the six panel doors. June did the majority of the poly work, it was a lot of doors.
Trim is called finish work, but should be called unfinished work, since it is never finished.
I ordered:
1000' of Victorian Casing
100 Corner Blocks
60 Plinth Blocks
350' of Victorian Baseboard
350' Base Shoe
900' of Jam Extension Material
100' of 1 1/16" x 4" for Window Sills
I thought I over estimated, I barely had enough.